German grid operator: We should take a more measured approach to solar expansion

Installed solar capacity has surged across Europe in recent years. Germany, a neighbouring country, is one of the most developed markets, with total installed photovoltaic capacity already exceeding 100 GW. However, the rapid expansion of solar power also places greater demands on transmission and distribution grids. According to one of Germany’s transmission system operators, the expansion of solar energy should be approached more evenly and cautiously.
The development of transmission and distribution grids is often associated with the transition to energy systems based on renewable sources. According to 50Hertz, one of Germany’s transmission system operators, there is a risk of overloading transmission grids unless the future expansion of solar energy is accompanied by measures to develop the grids.
At the beginning of the week, 50Hertz CEO Stefan Kapferer said, according to Clean Energy Wire, that grid stability and affordability are facing a growing number of challenges. Further solar expansion, he said, should therefore be guided by realistic assumptions about future electricity demand, the development of power grids and greater storage capacity to support grid operations.
Translation disclaimer
This article is a machine translation of the Czech original and has not yet been fully reviewed. In case of any doubt, please refer to the Czech version.
The article continues for subscribers
Premium content
The rest of this article is available to premium subscribers only. Get access to all premium articles on oEnergetice.cz.
Best value: annual subscription
Monthly option 4 € / month
3.25 €/ month




