Germany reports record volume of permits for new wind projects

Germany’s wind power sector had a successful first half of this year. Nearly 8 GW of projects received construction permits, and around 2.2 GW of projects were commissioned. However, the sector and non-governmental organisations are watching with concern as Germany’s economy ministry prepares a “reality check” of the country’s energy policy.
The first half of 2025 brought a record volume of permits for new wind farms in Germany. Compared with the same period in 2024, the total rose by almost two-thirds to 7.8 GW. Regionally, the increase was driven by projects in North Rhine-Westphalia (2.7 GW), Lower Saxony (1.6 GW) and Bavaria (0.8 GW).
An analysis by the industry association Fachagentur Wind und Solar, reported by the international news outlet Clean Energy Wire, found that the average time required to obtain construction permits for projects approved in the first half of this year fell by around 20% year on year, to 18 months.
Translation disclaimer
This article is a machine translation of the Czech original and has not yet been fully reviewed. In case of any doubt, please refer to the Czech version.
The article continues for subscribers
Premium content
The rest of this article is available to premium subscribers only. Get access to all premium articles on oEnergetice.cz.
You have read only 42% of the article — unlock the remaining 58% with a premium subscription.
Best value: annual subscription
Monthly option 4 € / month
3.25 €/ month




