Norway's government wants to introduce measures allowing it to limit electricity exports

The Norwegian government has presented several measures aimed at securing water reserves, including the option for authorities to intervene and limit electricity exports if reservoir levels become critically low. Statnett, Norway’s transmission system operator, has spoken out against restricting electricity exports from Norway, a traditional exporter.
"We must ensure that Norway has enough energy," Energy Minister Terje Aasland said. "That means ensuring the security of our own supply. We must be able to rely on there always being enough water in our reservoirs."
Aasland said he believes the other measures in the package will prevent the need to reduce exports. These measures include requiring hydropower operators to maintain security of supply, drawing up plans to secure water reserves, and introducing stricter reporting requirements on reservoir levels. The government is expected to introduce the measures before the next winter season.
Norway, which is connected by undersea HVDC cables to Germany, Denmark and the United Kingdom, and by several AC interconnectors to neighbouring Sweden, is unlikely to restrict electricity export capacity to neighbouring countries, Aasland said. However, the country needs a policy tool to prevent supply shortages when water reserves for hydropower plants are low, he added.
Translation disclaimer
This article is a machine translation of the Czech original and has not yet been fully reviewed. In case of any doubt, please refer to the Czech version.
The article continues for subscribers
Premium content
The rest of this article is available to premium subscribers only. Get access to all premium articles on oEnergetice.cz.
You have read only 33% of the article — unlock the remaining 67% with a premium subscription.
Best value: annual subscription
Monthly option 4 € / month
3.25 €/ month




