American nuclear plant Hatch gets green light for 80-year operation

The Edwin I. Hatch Nuclear Plant in the US state of Georgia has received a 20-year operating licence extension from the regulator. The two units, commissioned in 1975 and 1979, can therefore generate electricity into the second half of the 2050s. The boiling water reactor plant has a total installed capacity of almost 1.8 GW. The US nuclear regulator has already approved 80-year operation for around 20 units.
US energy company Georgia Power announced that it had received a licence extension for the Edwin I. Hatch plant from the US Nuclear Regulatory Commission (NRC). The two-unit boiling water reactor plant, whose units were commissioned in the 1970s, has an installed capacity of 1759 MWe. The 20-year operating licence extension allows the plant to generate electricity from Unit 1 until 2054 and Unit 2 until 2058.
“Our nuclear facilities provide reliable energy around the clock at stable and predictable prices. I am proud of the work that takes place at the Hatch plant every day, of the dedication of the teams on site, and of the fact that all our customers benefit from the plant’s reliability and efficiency. This licence extension is great news as our state continues to grow and demand for electricity continues to rise,” said Kim Greene, chair, president and CEO of Georgia Power,
Translation disclaimer
This article is a machine translation of the Czech original and has not yet been fully reviewed. In case of any doubt, please refer to the Czech version.
The article continues for subscribers
Premium content
The rest of this article is available to premium subscribers only. Get access to all premium articles on oEnergetice.cz.
You have read only 44% of the article — unlock the remaining 56% with a premium subscription.
Best value: annual subscription
Monthly option 4 € / month
3.25 €/ month




