Estonia selects small BWRX-300 reactor for its first nuclear power plant

Estonian company Fermi Energia has selected the BWRX-300 small modular reactor from GE Hitachi Nuclear Energy (GEH) for construction. The reactor could be deployed in the Baltic country in the early 2030s. Two other SMR designs were also under consideration.
In September 2022, Fermi Energia said it intended to assess three SMR designs: GE Hitachi, NuScale and Rolls-Royce. Bids containing the comprehensive technical documentation needed to estimate construction costs were due by December. The company said it assessed technological maturity, the establishment of a reference reactor, economic competitiveness and the potential for Estonian companies to participate in the supply chain when selecting the technology.
Fermi Energia has now announced GEH as the successful bidder. The two parties will now sign an agreement on project development and preliminary work.
GE Hitachi's scaled-down boiling water reactor
GEH's BWRX-300 is a 300 MWe naturally circulating, water-cooled SMR with passive safety systems. The unit is based on GEH's ESBWR boiling water reactor design and licensing basis. It is currently undergoing a pre-licensing design review by the Canadian Nuclear Safety Commission and a vendor design review by the US Nuclear Regulatory Commission.
Translation disclaimer
This article is a machine translation of the Czech original and has not yet been fully reviewed. In case of any doubt, please refer to the Czech version.
The article continues for subscribers
Premium content
The rest of this article is available to premium subscribers only. Get access to all premium articles on oEnergetice.cz.
You have read only 23% of the article — unlock the remaining 77% with a premium subscription.
Best value: annual subscription
Monthly option 4 € / month
3.25 €/ month




