New facility for testing chloride salts for molten salt-cooled fast reactors completed in Washington

Southern Company and TerraPower have completed construction and installation of a new test facility at TerraPower’s laboratories in Everett, Washington. The facility will be used to test chloride salts for the development of a molten chloride fast reactor (MCFR).
The test loop is the largest system of its kind developed by the nuclear sector. The project marks the culmination of years of research and testing of individual effects, and aims to demonstrate chloride salt-cooled reactor technology for deployment in the emissions-free, affordable energy system of the future. Researchers plan to have the new MCFR reactor operating by 2035.
The facility, called the Integrated Effects Test (IET), is a multi-loop test facility based on a series of smaller test tasks used to develop the final design. The non-nuclear system is heated by an external power source. The results of individual tests and facility operations will be used to develop computational codes for thermal-hydraulic and safety analyses. These are needed to develop a molten salt-cooled demonstration reactor.
Translation disclaimer
This article is a machine translation of the Czech original and has not yet been fully reviewed. In case of any doubt, please refer to the Czech version.
The article continues for subscribers
Premium content
The rest of this article is available to premium subscribers only. Get access to all premium articles on oEnergetice.cz.
You have read only 27% of the article — unlock the remaining 73% with a premium subscription.
Best value: annual subscription
Monthly option 4 € / month
3.25 €/ month




