Poland wants to build a nuclear power plant on the Baltic coast; many are protesting

Slajszewo (Poland), Jan. 14 (CTK/DPA) – Large jars of dried porcini mushrooms stand on a green tiled stove. Through the dining room’s French windows, Joanna Zwierzchowska looks out at the snow-covered Pomeranian landscape. „This is my oasis,“ says the 51-year-old businesswoman, who runs a travel agency in Gdańsk. But this idyll is under threat. Zwierzchowska’s home is in Slajszewo, a village on Poland’s Baltic coast, DPA reports.
Not far from here, around 80 kilometers northwest of Gdańsk and about 300 kilometers from the German border, Poland plans to build its first nuclear power plant. The plan is meeting opposition not only in the region. People in Germany, which is critical of nuclear power, are also watching Poland’s nuclear plans with concern.
In early November, Poland’s national-conservative government, led by the Law and Justice party (PiS), gave US conglomerate Westinghouse approval to build the country’s first nuclear power plant. Construction costs are expected to amount to around 447 billion crowns. Poland’s Environment Minister Anna Moskwa was somewhat vague about the plant’s location, saying that the „area around Kopalino-Lubiatowo“ was preferred. This is a neighboring municipality to Slajszewo.
Translation disclaimer
This article is a machine translation of the Czech original and has not yet been fully reviewed. In case of any doubt, please refer to the Czech version.
The article continues for subscribers
Premium content
The rest of this article is available to premium subscribers only. Get access to all premium articles on oEnergetice.cz.
You have read only 23% of the article — unlock the remaining 77% with a premium subscription.
Best value: annual subscription
Monthly option 4 € / month
3.25 €/ month




