Russian regulator issues license for another unit at Ukraine’s Zaporizhzhia nuclear power plant

Russia is taking steps to restart Europe’s largest nuclear power plant, with Russia’s nuclear regulator issuing an operating license for the second unit. The plant is not, however, located in Russia; it is Ukraine’s Zaporizhzhia nuclear power plant. Russia began occupying it in 2022 after launching its military invasion of Ukraine.
The Zaporizhzhia nuclear power plant has been under Russian control for nearly four years. The plant has long been the focus of European governments, national nuclear regulators and international agencies, particularly because of its proximity to the front line. It has long faced problems with its electricity supply, with Russia and Ukraine repeatedly accusing each other of attacks on nearby energy infrastructure. All six nuclear units are shut down, so the plant has to rely on external supplies to ensure cooling.
With an installed capacity of 5.7 GW, the plant is the largest nuclear power plant in Europe. It could provide Ukraine with much-needed capacity, which the country lacks following Russia’s extensive attacks on its infrastructure. For now, however, it seems that if the plant is restarted in the near future, it will be under Russian control.
Translation disclaimer
This article is a machine translation of the Czech original and has not yet been fully reviewed. In case of any doubt, please refer to the Czech version.
The article continues for subscribers
Premium content
The rest of this article is available to premium subscribers only. Get access to all premium articles on oEnergetice.cz.
You have read only 45% of the article — unlock the remaining 55% with a premium subscription.
Best value: annual subscription
Monthly option 4 € / month
3.25 €/ month




