U.S. government to support completion of Xe-100 design. Demonstration reactor expected to start up within 6 years

The U.S. Department of Energy (DOE) has approved $40 million in support for a six-year project to complete the basic design of a high-temperature gas-cooled reactor (HTGR). According to DOE, this is intended to help pave the way for X-energy’s multibillion-dollar demonstration project and the first commercial facility in the United States to produce high-assay low-enriched uranium (HALEU)-based fuel for next-generation reactors.
Maryland-based X-energy received an Advanced Reactor Concepts (ARC) grant in 2015 to further develop the design of its advanced Xe-100 reactor and TRISO-X particle fuel. The project resulted in completion of the reactor’s basic design and production of its first TRISO (tristructural-isotropic) fuel pebbles using natural uranium at the pilot fuel facility at Oak Ridge National Laboratory, which was commissioned as part of the project.

First reactor planned to start up in 2028
X-energy is now seeking a license for its reactor design from the U.S. Nuclear Regulatory Commission (NRC). It is also working on a license and future operation of a HALEU fuel production facility, funded through DOE’s Advanced Reactor Demonstration Program (ARDP).
Translation disclaimer
This article is a machine translation of the Czech original and has not yet been fully reviewed. In case of any doubt, please refer to the Czech version.
The article continues for subscribers
Premium content
The rest of this article is available to premium subscribers only. Get access to all premium articles on oEnergetice.cz.
You have read only 35% of the article — unlock the remaining 65% with a premium subscription.
Best value: annual subscription
Monthly option 4 € / month
3.25 €/ month




