France's first offshore wind farm reaches full operation, ten years after winning support

Eduard Majling
Eduard Majling
24 November 2022, 17:05
France's first offshore wind farm reaches full operation, ten years after winning support

Unlike the United Kingdom, Germany, the Netherlands, Belgium and Denmark, offshore wind power in France is still in its infancy, with the country's first commercial-scale offshore wind farm entering full commercial operation this week. According to EDF Renewables, development of the entire project took around 10 years, while construction itself took just under three years.

EDF Renewables, a subsidiary of the French EDF Group, announced the completion of the Saint-Nazaire offshore wind farm, which, with an installed capacity of 480 MW, is the first commercial-scale offshore wind farm to be built off the coast of France. According to EDF Renewables, its annual output is expected to be equivalent to the consumption of 700,000 people.

The wind farm, located 12 to 20 km southwest of the mouth of the Loire, France's longest river, consists of 80 offshore turbines, each with an installed capacity of 6 MW, covering a total area of approximately 78 square kilometres.

Translation disclaimer

This article is a machine translation of the Czech original and has not yet been fully reviewed. In case of any doubt, please refer to the Czech version.

The article continues for subscribers

Premium content

The rest of this article is available to premium subscribers only. Get access to all premium articles on oEnergetice.cz.

Best value: annual subscription

Monthly option 4 € / month

3.25 €/ month

I already have a subscription