ČEPS: Development of the energy system in Czechia will cost hundreds of billions of crowns in coming years

Developing and strengthening the transmission system and distribution networks in Czechia will cost hundreds of billions of crowns in the coming years. The reason is the need for measures to ensure grid stability as decarbonisation progresses and electricity consumption increases. Karel Vinkler, director of the Strategy Division at state-owned ČEPS, said this at a nuclear energy conference today. He said the country’s energy sector will not be able to do without more new nuclear power sources in the future, while renewable energy sources will cover only part of future consumption.
Under measures adopted by the European Parliament, the Czech Republic will have to cut emissions by 26 percent by 2030. This will increase pressure to electrify the country’s economy, replacing current fossil fuel sources. It will also place greater demands on the country’s transmission system and distribution networks. Vinkler said that major investments will therefore be needed to strengthen and secure them. In his view, these investments will gradually amount to hundreds of billions of crowns.
Translation disclaimer
This article is a machine translation of the Czech original and has not yet been fully reviewed. In case of any doubt, please refer to the Czech version.
The article continues for subscribers
Premium content
The rest of this article is available to premium subscribers only. Get access to all premium articles on oEnergetice.cz.
You have read only 31% of the article — unlock the remaining 69% with a premium subscription.
Best value: annual subscription
Monthly option 4 € / month
3.25 €/ month




