First turbine at world's largest offshore wind farm delivers electricity to the grid

Jiří Salavec
Jiří Salavec
13 October 2023, 11:11
First turbine at world's largest offshore wind farm delivers electricity to the grid

The UK’s Dogger Bank offshore wind farm project has reached its first major operational milestone. Technicians installed and commissioned the first 13 MW Haliade-X turbine. Soon afterwards, it began delivering its first electricity to the grid via a direct-current cable. The wind farm’s total capacity will reach 3.6 GW across three phases, making it the world’s largest offshore wind farm.

SSE Renewables announced that the first wind turbine at its Dogger Bank project had begun supplying electricity to the UK grid. Generation began on the evening of Saturday, 7 October, through the high-voltage direct-current (HVDC) cable connecting the project to the mainland. Dogger Bank wind farm is located in the North Sea, around 130 kilometres off England’s east coast.

“Offshore wind power is vital for generating renewable energy that can supply British households from British seas. That is why it is fantastic to see the world’s largest wind farm, Dogger Bank, generating electricity for the first time today. It will not only strengthen our energy security, but also create jobs, lower electricity bills and keep us on track to reach net zero,” said UK Prime Minister Rishi Sunak.
Translation disclaimer

This article is a machine translation of the Czech original and has not yet been fully reviewed. In case of any doubt, please refer to the Czech version.

The article continues for subscribers

Premium content

The rest of this article is available to premium subscribers only. Get access to all premium articles on oEnergetice.cz.

You have read only 48% of the article — unlock the remaining 52% with a premium subscription.

Best value: annual subscription

Monthly option 4 € / month

3.25 €/ month

I already have a subscription