Top 10 energy stories of the past week

1. A nuclear waste repository costing CZK 510 billion is to be built just 2 km from the German border

Switzerland selected its preferred site for a nuclear waste repository earlier this week. Construction costs for the repository, which is intended to hold all radioactive waste originating in Switzerland, are estimated at 20 billion Swiss francs (approx. CZK 510 billion).
After more than 14 years, the Swiss organisation NAGRA (the National Cooperative for the Disposal of Radioactive Waste) has chosen the most suitable site for a nuclear waste repository. Northern Lägern was selected for its favourable geological conditions – the exact site is just two kilometres from the German border.
2. French EDF subsidiary makes huge mistake on spot market, faces a bill of around EUR 60 million

Electricite de Strasbourg, majority-owned by French energy giant EDF, accidentally sold electricity at capacities of 2.03 GW and 5.75 GW on the spot market, foreign news outlet Montel reports. Fearing that sufficient electricity supplies could not be secured, the French transmission system operator sent a warning signal to neighbouring countries.
Translation disclaimer
This article is a machine translation of the Czech original and has not yet been fully reviewed. In case of any doubt, please refer to the Czech version.
The article continues for subscribers
Premium content
The rest of this article is available to premium subscribers only. Get access to all premium articles on oEnergetice.cz.
You have read only 14% of the article — unlock the remaining 86% with a premium subscription.
Best value: annual subscription
Monthly option 4 € / month
3.25 €/ month




