Slovenia: Working group to speed preparations for country's second nuclear unit

The Slovenian government has established a working group to coordinate preparatory work for the construction of a second nuclear unit in the country. Slovenia wants low-carbon sources to meet electricity demand, which is expected to double by 2050. The country currently operates one pressurized water reactor with a capacity of 730 MW.
At the end of September, a working group met for the first time in Slovenia to coordinate preparatory activities for the New Nuclear Power Plant Krško 2 project. The Slovenian government aims to accelerate preparations for the construction of a second nuclear unit in the country. The unit is expected to help the country transition to low-emission electricity generation in the future and move away from coal.
Slovenia’s prime minister sees decarbonising the energy sector as an important part of tackling the climate crisis, and says the country should respond as soon as possible. However, at the end of last year he said that a referendum on the new nuclear unit would be held before the government makes a decision.
Translation disclaimer
This article is a machine translation of the Czech original and has not yet been fully reviewed. In case of any doubt, please refer to the Czech version.
The article continues for subscribers
Premium content
The rest of this article is available to premium subscribers only. Get access to all premium articles on oEnergetice.cz.
You have read only 45% of the article — unlock the remaining 55% with a premium subscription.
Best value: annual subscription
Monthly option 4 € / month
3.25 €/ month




